PROJECT REFERENCES

NO PROJECT NAME YEAR
97 EXPANSION JOINT FLANGE FOR CHAMBER 2014
98 PALM OLEO RAWANG (PO-017) SUBSTRUCTURE, SUPERSTRUCTUE AND EQUIPMENT INSTALL 2014
99 TO FABRICATE & INSTALL MILD STEEL CHIMNEY FOR F27 CONS TRUCTION OF COOLING CHILLER PLATFORM 2014
100 FAB. MOLTEN SULPHUR TANKS
PROJECT – EP0043-CONST. ERECTION & EQUIPMENT INSTALLATION FOR EP-4 RG
SME-2-PROJECT AREA 1 – FILTER PRESS BUILDING TO INSTALL EQUIPMENT AT AREA 1
2014
101 WATER COOLED DUCT, FIX DUCT, MOBILE DUCT, LADLE HOOD, 2014
102 PANEL, WATER COOLED DUCT, ROOF, HOOD 2014
103 INSTALL J-BOLT FOR HALF 3, HALT 4 & HALT 5
STEEL STRUCTURE WORKS & BONDEK-BRT – HALT 5 & BRT HAL 6
STEEL STRUCTURE WORKS – SP3
2014
104 COOLED PANEL & HEAT EXCHANGER 2014
105 M-PROJECT – FERTILISER (PROJECT NO:MM2) 2014
106 SUPPLY, FABRICATE & INSTALL CONVEYOR BELT 2014
107 KVMRT PACKAGE V8- FABRICATION OF STEEL STRUCTURE WORKS OF GIRDER & TRUSSES 2015
108 UPPER SHELL PANEL 2015
109 FABRICATE & INSTALLATION OF DUCTING NO. 1 – NO.6 2015
110 FABRICATE AND DELIVER LADLE HOOD LF1
RADIAN COOLER FOR EAF 1
REAIR OF EBT PANEL
2015
111 FABRICATE & INSTALLATION OF RAW COAL VIBRATION SCREEN HACK & LIFTING OF DOOR OPENING & EXTENSION PLATFORM TO FABRICATE & INSTALL THE CEMENT MILLS NO . 6 MODIFICATION 2015
112 P38 HOIST BEAM MODIFICATION, DISMANTLE 34E3 TOP MOTOR TO INSTALL THE AGITATOR FOR MOLTEN SULPHUR TANK 2015
113 STEEL SUPPORT FOR CYCLONE AT LEVEL 8 PREHEATER TOWER 2015
114 KVMRT PACKAGE S3-FABRICATION & INSTALLATION OF ROOF TRUSS 2015
115 KVMRT PACKAGE S3-FABRICATION & INSTALLATION OF LINK BRIDGE 2015
116 CJ-BIO M-PROJECT – DA-3274 STRUCTURE
CJ-BIO-C2 PROJECT – C2 BUILDING STEEL STRUTURE (MC2-SUB-CS-002)
CJ-BIO-C2 PROJECT – CRYSTALIZER STEE (MC2-SUB-CS-005)
2015
117 FABRICATE OF NEW SKAG DOOR PANEL & ROOF PANEL 2015
118 FABRICATE AF 6 FURNACE COOLED DELTA RING & PANEL 2015
119 FABRICATE SPACE TUBE C/W NUT TO BINTULU
FABRICATE SPETCTACLE BLIND PLATE
2015
120 STEEL STRUCTURE WORKS – PERUMAHAN 5 2015

 