NO | PROJECT NAME | YEAR |
73 | TUNDISH BODY, WATER COOL PANEL, EBT PANEL | 2012 |
74 | CONSTRUCTION SAMPLE PARTITION | 2012 |
75 | LOWER SHELL STRUCTURE, VLB PANEL, SHAFT, SHAFT FURNACE PARTS TILT FRAM, WATER COOLED DUCT SMLS LADLE DISH & ETC. | 2013 |
76 | STEEL WATER TANK, 200M3, 3000M3 & 5000 M3 | 2013 |
77 | TRANSFER TOWER TS11, CONVEYOR BC2A/2B, CHUTE BC2A/2B | 2013 |
78 | UPPER SHELL PANEL, ROOF PANEL, WATER COOLED DUCT | 2013 |
79 | NEW ROOF PANEL, WATER COOLED PANEL & DOOR TUNNER | 2013 |
80 | DC LOWER SHEEL, PANEL, WATER COOLED DUCT , LADLE HOOD SHAFT FURNACE PARTS, TILT FRAME | 2013 |
81 | MILD STEEL WORKS – STAIRCASE | 2013 |
82 | STRUCTURAL STEEL WORKS – KERTIH, KEMAMAN | 2013 |
83 | STRUCTURAL STEEL WORKS – LINK BRIDGE | 2013 |
84 | STAINLESS STEEL SILO | 2013 |
85 | WATER COOLED PANEL NO. 8, 9, 10, ROOF ELBOW | 2013 |
86 | COPPER CONTACT PAD, SHELL PANEL, BSE CU-STEEL PANEL | 2013 |
87 | WATER COOLED DUCT, FIX DUCT, MOBILE DUCT, LADLE HOOD, | 2013 |
88 | PANEL, WATER COOLED DUCT, ROOF, HOOD | 2013 |
89 | STRUCTURAL STEEL WORKS FOR CJ BIO M-PROJECT | 2013 |
90 | PROJECT OM-041-CONSTRUCTION, ERECTION & EQUIPMENT INSTALLATION FOR SME-2 WET PLANT SUPERS TRUCTURE, PIPERBACK | 2013 |
91 | VLB PANEL, WC PANEL, SCRAP BUCKET, BUCKET LINK, LADAE DISH PLATE, SLAG HANDLING | 2014 |
92 | FABRICTE 70T EMERGENCY CASTING LADLE V-CHAMBER, VLB WALL PANEL | 2014 |
93 | FABRICATE & REPLACEMENT OF KILN INLET SEAL | 2014 |
94 | FABRICATE IF CHARGES SYSTEM AND SUPPLY OF DN450 FLANGE | 2014 |
95 | WATER COOLED PANEL, WATER COOLED DUCT & ETC | 2014 |
96 | FABRICATE SETTLING CHAMBER PANEL, DUCT STRUCTURE ROOF TRUSS FOR BLUESCOPE LYSAGHT | 2014 |