25 STRUCTURAL STEEL WORKS FOR NEW CENTRALIZED WORKSHOP 2008
26 DRI – AIR DUCT SUPPORT, VAPOR REMOVOL, VESSELS, RECOVERING CASING, BIG BORE PIPE & JETTY RECEIVING HOPPER 2006
27 DUST COLLECTOR REVAMPING UP GRADING PROJECT 2009
28 RAW MATERIAL YARD CONVEYOR SYSTEM & TRANSFER STATION 2007
29 RAW MATERIAL YARD STACKER RECLAIMER INSTALLATION 2009
30 STEEL MAKING PLANT DUST COLLECTOR MAINTENANCE PROJECT 2008
31 SOAKING FURNACE UP GRADING PROJECT 2008
32 DROP OUT BOX WATER-COOLED DUCT, FIXED DUCT 2003-2011
33 SCRAP CLEANING MACHINE – FABRICATION & INSTALLATION 2009
34 10TPH COAL GRINDING/SUPPORT LEG – LIME KILN PROJECT 2006
35 PACKAGE 9 – CONSTRUCTION AND COMPLETION OF RAW MATERIAL YARD BUNKER NO. 1 & 2 AND CONVEYOR TUNNEL TL-1 & TL-2 2008
36 PACKAGE 16R – CONSTRUCTION & COMPLETION OF THE REMAINING WORKS FOR SINTER TAIL DEDUSTING, FINISH PRODUCT SCREENING ROOM, PALLETIZING ROOM, FINISH PRODUCT STORAGE BUNKER, BLENDING ROOM, TRANSFER STATIONS & CONVEYOR TUNNELS & SUPPORTS 2009-2010
37 PACKAGE 20R – CONSTRUCTION & COMPLETION OF THE REMAINING WORKS FOR SLAG GRANULATION PLANT, WATER TREATMENT PLANT & SUB-STATION, ORE BUNKER DEDUSTER PLATFR PLATFORM & BF GAS TANK FOUNDATION & ANCILLARY BUILDINGS 2009-2010
38 PACKAGE 21 – CONSTRUCTION & COMPLETION OF TRANSFERSTATIONS & CONVEYOR FOUNDATIONS, SUB-STATIONS NO.2 & 3, UNDERGROUND RECEIVING BUNKER, CRUSHER ROOM, SCREENING ROOM, SPRINKLER WATER TANK & PUMP STATION AND DEDUSTING BUILDINGS & FOUNDATIONS AT RAW MATERIAL YARD 2009-2010
39 PACKAGE 22 – CONSTRUCTION & COMPLETION OF BLENDING STORAGE BUNKER, DEDUSTING & SUB-STATION FOR BLENDING BUNKER, MAIN CONTROL BUILDING, AIR COMPRESSOR AND FOUNDATION FOR CONVEYOR TL10, TL11 & TL12 AT RAW MA TERIAL STORAGE YARD 2009-2010
40 OVERHEAD CONVEYOR GANTRY STEEL STRUCTURE WORKS 2010
41 1000M3 LIME SILO AND STRUCTURES 2010
42 COMPLETE DUST COLLECTOR SYSTEM FOR WASTE GAS FIL TER SYSTEM (150,000 M3/H) & LIME DUST FIL TER SYSTEM (90,000 M3/H) 2010
43 COMPLETE DUST COLLECTOR SYSTEM FOR SKULL CUTTING (80,000 M3/H) 2010
44 1×10 TPH LIME HYDRATION PLANT 2010
45 LIME KILN – PHASE 2 2010
46 ROLLING MILL – CIVIL & STRUCTURE 2010
47 DESIGN & BUILD RMY SOIL TREATMENT (STONE COLUMN) 2010
48 EXPANSION TANK PLATFORM 2011

 