NO | PROJECT NAME | YEAR |
121 | EQUIPMENT INSTALLATION | 2015 |
122 | FABRICATE OF SOCKET AND PULLY | 2015 |
123 | NEW 1000 CUBIC METER WATER TANK | 2015 |
124 | FABRICATE & INSTALLATION OF RAW MILL 1 NOZZLE | 2015 |
125 | FABRICATE & INSTALLATION OF CSO ROOM STRUCTURAL STEEL | 2015 |
126 | FABRICATE & INSTALL OF STEEL STRUCTURE WORKS (MALL) AT JOHOR BHARU | 2015 |
127 | ROOM CEILING SUPPORT AT THE CURVE STATION & ONE U STATION MRT STATION – ONE UTAMA , DAMANSARA FABRICATE & INSTALLATION OF – LIFT FRAME AT TTDI & ONE UTAMA |
2015 |
128 | CJ-BIO-C2 PROJECT – C2-BUILDING DECK (MC2-SUB-CS-008) CJ-BIO-C2 PROJECT – C2-EXTERIOR WORKS (MC2-SUB-CS-010) CJ-BIO-C2 PROJECT – C2-PIPE RACK (MC2-SUB-CS-011) CJ-BIO-C2 PROJECT – C2-NEW PRODUCT WAREHOUSE (MC2-SUB-CS-013) CJ-BIO-C2 PROJECT – C2-SCRUBBER STACK (MC2-SUB-CS019) CJ-BIO-C2 PROJECT – C2-STAINLESS STEEL TANK (MC2-SUB-ME-00) |
2016 |
129 | DESARU CONFERENCE CENTRE – METAL ROOF COVERING WORKS DESARU CONFERENCE CENTRE – STEEL STRUCTURAL WORKS |
2016 |
130 | COPPER BLOCK FOR VLB #1/3, #4/5, 80T LADLE ROOF , DELTERING | 2016 |
131 | STRUCTURAL STEEL WORKS FOR UMV (PACKAGE 1,2 & 3-PRACELF) STRUCTURAL STEEL WORKS FOR UMV (PRACELCP3) |
2016 |
132 | FABRICATE & ERECTION OF 18 UNITS OF STAINLESS STEEL STORAGE TANK | 2016 |
133 | FABRICATE & INSTALLATION OF – LINK BRIDGE STEEL STRUCTURE | 2016 |
134 | STEEL CONNECTION FOR CANOPY & BEAM STRENGTHENING WORKS | 2016 |
135 | CJ-BIO-C3 PROJECT – C3-FERMENTATION EXTENSION (MM3-SUB-CS-016) CJ-BIO-C3 PROJECT – C3-REFINERY #2 & #4 (MM3-SUB-CS-018) CJ-BIO-C3 PROJECT – C3-DECK PIATE (MM3-SUB-CS022) CJ-BIO-C3 PROJECT – C3-C3 SETS OF TANKS (MM3-SUB-ME-006) CJ-BIO-C3 PROJECT – C3-EXTERIOR WORKS (MM3-SUB-CS-024) CJ-BIO-C3 PROJECT – C3-YARD STEEL STRUCTURE 1 (MM3-SUB-CS-025) CJ-BIO-C3 PROJECT – C3-YARD STEEL STRUCTURE 2 (MM3-SUB-CS-026) |
2017 |
136 | MRT – FABRICATE & INSTALLATION OF – LINK BRIDGE STEEL STRCTURE FOR ONE UTAMA STATION | 2017 |
137 | STEEL STRUCTURE WORKS FOR KIBING GLASS FACTORY | 2017 |
138 | STRUCTURAL WORKS – SKYBRIDGE AND ENTRANCE ARCH, CYBER | 2017 |
139 | FABRICATE, INSPECTION OF PIPING C/W CONNECTION STRUCTURAL WORKS – ENCLOSURE, SUPPORT, FLUDIC FENCE, BAFFLE WALL | 2017 |
140 | FABRICATE OF FIRE PUMP SHELTER , BOILER CHEMICAL FEED SHELTER STEEL STRUCTURE WORKS FOR WORKSHOP & WARE HOUSE | 2017 |
141 | FABRICATE STEEL STRUCTURE FOR DASH CB3 | 2017 |
142 | IPKB-KKM-PEDESTRIAN LINK BRIDGE | 2017 |
143 | FABRICATE CANTILEVEL GANTRY CRANE STRUCTURAL – 10T X 28.6 SPAN | 2017 |
144 | STRUCTURAL WORKS – OFFICE TOWER, PARKING EXTERNAL WORKS – PARCEL F, PKG 3 & PKG 4 | 2017 |