Project References 3

PROJECT REFERENCES

NO PROJECT NAME YEAR
49 WATER COOLED HOT GAS LINE EAF #6, #7 & #8 2011
50 WATER COOLED HOT GAS DUCT SUPPORT 2011
51 STEEL STAIRCASE, HAND RAILING & CHANNEL SUPPORT 2011
52 HOPPER BODY FOR 758 CMS BAG FILTER 2011
53 STEEL STRUCTURE FOR GATE HOUSE & FIRE TRUCK STATION 2011
54 COMBUSTION CHAMBER SUCTION ELBOW ASSEMBLY 2011
55 NATURAL GAS & NITROGEN PIPING WORKS FOR SOAKING FURNACE 2011
56 RADIANT COOLER DUCT, ROOF PANEL, WATER COOLED PANEL 2011
57 DUCTING, DUST COLLECTOR SYSTEM, PANEL. EBT PANEL 2011
58 STEEL BINS WORKS 2011
59 INSTALLATION WORKS FOR DOWN GAUGE ALIGNMENT – SLAG PROCESSING PLANT 2012
60 PROPOSED BILLET GRINDING & BILLET SHOT CHIMNEY EXTENSION 2012
61 GAS TURBINE SILENCER 2012
62 STRUCTURAL STEEL WORKS FOR ELPION PROJECT AT BANTING, SELANGOR 2012
63 FLYING SHEAR , CRANK SHAFT, GEAR, GEAR SHAFT, LADLE DISH END PALATE 2012
64 PIPING WORKS FOR BGV WIRE ROD MILL REVAMPING PROJECT 2012
65 GANTRY CRANE STRUCTURE 2012
66 STEEL BIN WORKS PACKAGES – PASIR GUDANG, JOHOR 2012
67 FABRICATE EXPANSION JOINT 2012
68 MILD STEEL SILO AND STAINLESS STEEL SILO 2012
69 RADIANT COOLER DUCT, ROOF PANEL, WATER COOLED PANEL COPPER CONTACT PAD, WATER COOLED DOUBLE DUCT 2012
70 WATER COOLED DUCT, COOLING PANEL, ROOF PANEL 2012
71 ROOF PANEL, PTI PANEL 2012
72 RADIANT COOLER DUCT, ROOF PANEL, WATER COOLED PANEL COPPER CONTACT PAD, WATER COOLED DOUBLE DUCT 2012

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9